![[The ramp from 280 South to 87]](87_280_dec1986_1.jpg)
This sign assembly was paint bombed a year before this was taken.
The south bound ramp opened in September 1992.
![[The Ramp from 280 to 87]](87_280_dec1986_2.jpg)
The bridges of 87 are under construction and also the express lane is under construction. The light rail line is just out of the picture to the right.
![[I280 South to 87 North]](87_280_dec1986_3.jpg)
This is looking at the new construction of 87. The express lanes
were under construction.