This is by the new bridge over Julian Street and St. James Street.
This is near Hedding. The freeway was built to the left and it was
built high up. This was under construction starting in 1999.
This is between Hedding and I880. The freeway was done around 2004.
This is Guadalupe Parkway closer to I880.
This is right before I880. This shows the early days of the light
rail line.
This is 87 over I880. An interchange was never built here and this
set of overpasses was taken out. A new set of overpasses was built in
the late 1990s. The San Jose Airport is in the distance.