Highway 85 Under Construction
These are from February 1989. They show Pollard Road three years
before 85 was being built out this way. This photo shows Pollard Road
going east. The freeway corridor is right by the big power lines in the
distance. I will leave these up permanently.
This is Pollard Road heading west. The corridor is about 1000 feet
ahead. Also there was snow on the hills in the distance.
This railroad crossing was gone in early 1992. The road was rerouted in
1992 to run under the freeway.
This is a little past the last photo and it shows the snow in the
mountains near Skyline. I hardly ever saw it like this out here.
These three are scanned from slides and they are from 1/20/1986. This
is the end of 85 between I280 and Stevens Creek back then.
This is from March 1986. This railroad crossing was gone by 1992. This
is by Wedgewood and Pollard. This intersection does not exist anymore
at all. This is scanned off slides. Pollard Road does not meet
Winchester anymore. The freeway currently runs just past where the
train tracks were back then. The train was slow here in the 1980s.
California
Highway
85
Index Page
Home