152 West Construction Photos

These are from 9/18/2008 and they show the new interchange being built between 152 and 156. The construction is not 100% done here. I didn't see a climbing lane being built westbound past 156 but maybe it hasn't been started yet.

  The overhead sign is new and this is approaching the end of the project done in 1990 - 1991. Note the Measure A sign.

[152 West]

The speed limit drops to 40 temporarily.

[152 West]

Here is a 40 MPH speed sign, and some of the center divide has been torn out. There had been a left turn lane for 156 since 1991 but it faced a stop sign before.

[152 West]

The bridge is 152 Eastbound.

[152 West]

152 West Construction Photos
152 Index Page
 Home   

©2008  | Contact info for Eric Buchanan