152 East Construction Photos

These are from 9/18/2008 and show the new climbing lane and retaining wall on 152 East and the new interchange with 156. The construction is not 100% done here at the time of writing.

I don't know if there will be a climbing lane on 152 Westbound through here.

[152 East]

There used to be a stop sign ahead for the left turn from 152 West to 156 West. This area had not changed since 1991.

[152 East]

The flyover and signs are new here. The speed limit is temporarily 40 MPH here.

[152 East]

The interchange was made by making a flyover over the old intersection.

[152 East]

152 East Construction Photos
152 Index Page
 Home   

©2008 | Contact info for Eric Buchanan