Before the Hollister bypass opened the highway had a left turn
then
a right turn in Hollister. This is
fifteen miles south of Hollister by Enterprise. Starting a mile
before
this area is where 25 becomes 55 MPH. It is
never over 55 MPH.
Fairview
Road
North
This is seventeen miles south of US101 by Best Road.
Tres
Pinos
This is nineteen miles south of US101, by Bolado Road.
This is also by Bolado Road on 4/1/2009.
This is 23 miles south of US101 and here the landscape becomes
drier. Right after this, the highway passes J1, which is
proposed
Highway 180, and it leads to Fresno. There is a reservoir to the
left
after this.